Pyhänkoski, Pyhäjoki-Merijärvi

The wind park is owned by Pyhänkosken Tuulivoima Oy, but Puhuri Oy is responsible for operating it.

The Pyhänkoski wind park was completed and taken into production in June 2015.

The wind turbines are connected to the 110kV grid via the substation of the Ristiveto wind park.

Assessments to build these wind parks were made in 2012 and 2013. The construction work kicked off in the summer of 2014.

Production now

0 MW

Height

137 m

Turbines

4

Rotor

126 m