Production now

19,9 MW

Turbines

10 pcs

Height

137 m

Rotor

126 m

Kopsa II Wind Park was finalized and got to production at the end of 2014.

Utility contains 10 pcs of Vestas V126 3,3MW turbines, with hub height of 137m and rotor diameter of 126m.  Tip height is 200 meters.

Drafting of the Kopsa II land use plan was started in autumn 2012 and Raahe municipality approved the plan in June 2013.

In the second phase 10 Wind Turbines were built in the Nahkakallio and Tuppukangas regions.