The Piipsa project is run by Piipsan Tuulivoima oy.
The project area is located in the eastern part of the town of Haapavesi, bordering the municipal boundaries of Kärsämäki and Siikalatva.
The zoning for the Piipsa project was approved by the Haapavesi local council in February 2021. The zoning plan has space for 39 wind parks with a maximum height of 300 metres. The zoning plan has been brought before the Administrative Court. The wind turbines have been granted conditional building permits.
The aggregate needed to build the wind park is to be mined from the Siikaniemi area. The EIA process on the aggregate used in the project was conducted in 2021–2022. In November 2022, ELY issued a reasoned conclusion on the EIA report.
Power transmission will be implemented via Fingrid’s substation of Pihtineva. This is the same substation that is used in the Tuulikaarto wind power project in the Siikalatva and Kärsämäki areas.
Production now
Height
- m
Turbines
39
Rotor
- m
Käytämme verkkosivuillamme evästeitä tarjotaksemme sinulle parhaan kokemuksen. Napsauttamalla "Hyväksy kaikki" hyväksyt KAIKKIEN evästeiden käytön. Voit kuitenkin käydä "Evästeasetuksissa" muuttamassa asetuksia. Voit lukea täältä tietosuojaselosteen.
This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.